This site is provided to allow C&D employees to view open postings, while they are on vacation or on medical leave.
Employees will be allowed two (2) successful bids and one (1) refusal during a calendar year. Employees may bid while on
medical restrictions as long as such restrictions are removed within one (1) month from day the bid comes down.
All bidders who decline such bid within twenty-four (24) hours of the closing of such bid will not be charged with a bid or refusal.
Jobs posted will be available for bidding from the date and time posted, for two business days, and for withdrawal for one day after that. The timestamp on bid and withdrawal emails will be audited to ensure that they occurred within the bidding and withdrawal period.
| Job Title |
Bid Number |
Job Description |
Effective Date |
Expiration Date |
| LG5/6/9/10 CASTING UTILITY
| 1240 |
DUANE PETERSON'S JOB
1ST SHIFT 7AM TO 3PM
POSTED... |
06/22/2009 |
06/24/2009 |
| LG4 CONT. AIR TESTER/DIELECTRIC TESTING
| 1239 |
ROBERT POOLE'S JOB
M/TH 4PM/2AM
POSTED AT 8AM |
06/22/2009 |
06/24/2009 |
| LG6 CASTER
| 1238 |
JERRY HADDOCK'S JOB
1ST SHIFT
POSTED AT 8 AM |
06/18/2009 |
06/22/2009 |
| LG9 CONT. POST PLATER
| 1237 |
APRIL BAINBRIDGE'S JOB
FSS 5AM/5PM
POSTED AT 2PM |
06/15/2009 |
06/17/2009 |
| LG9 PASTE MACHINE TAKE OFF
| 1236 |
TRAVIS SCHAEFFER'S JOB
3RD SHIFT
POSTED AT 2PM |
06/15/2009 |
06/17/2009 |
| LG5 POT TENDER
| 1235 |
DAVID WILLIAMS' JOB
3RD SHIFT
POSTED AT 8:45AM |
06/12/2009 |
06/16/2009 |
| LG8 LP ASSEMBLER
| 1234 |
DEBBI HAYMAKER'S JOB
3RD SHIFT
POSTED AT 10:30 A... |
06/11/2009 |
06/15/2009 |
| LG8 JC/D ASSEMBLER
| 1233 |
DAN WELCH'S JOB
2ND SHIFT
POSTED AT 10:30AM |
06/11/2009 |
06/15/2009 |
| LG9 CONTINUOUS POST PLATER
| 1232 |
CATHY FISHER'S JOB
M-TH 4P-2A
POSTED AT 2:30 |
06/10/2009 |
06/12/2009 |
| LG9 TRUCK DRIVER
| 1230 |
LEE BOOTH'S JOB
3RD SHIFT
POSTED AT 1:30PM |
06/10/2009 |
06/12/2009 |
| LG4 CONT. AIR TESTER/DIELECTRIC TESTING
| 1229 |
DAN ROBERTS' JOB
M/TH 4PM-2AM
POSTED AT 2:15PM |
06/09/2009 |
06/11/2009 |
| LP ASSEMBLY UTILITY
| 1228 |
DENNIS HARDIN'S JOB
3RD SHIFT
POSTED AT 9:30AM |
06/09/2009 |
06/11/2009 |
| LG9 TRUCK DRIVER
| 1227 |
TREVOR MARTIN'S JOB
3RD SHIFT
POSTED AT 9:30AM |
06/09/2009 |
06/11/2009 |
| LG6 CASTER
| 1226 |
ADAM GULLEY'S JOB
2ND SHIFT
POSTED AT 9:30 |
06/09/2009 |
06/11/2009 |
| LG9 PARTS PACKER CONTINUOUS
| 1225 |
NEW JOB
FSS 5A TO 5P
POSTED AT 1:00 PM |
06/08/2009 |
06/10/2009 |
| LG9 PARTS PACKER
| 1224 |
NEW JOB
3RD SHIFT
POSTED AT 1:00 PM |
06/08/2009 |
06/10/2009 |
| LG9 PARTS PACKER
| 1223 |
NEW JOB
2ND SHIFT
POSTED AT 1:00 PM |
06/08/2009 |
06/10/2009 |
| LG9 CONTINUOUS SHIPPING UTILITY
| 1222 |
ALFREDO GIL'S JOB
FSS 5A/5P
POSTED AT 1:00 PM |
06/05/2009 |
06/09/2009 |
| LG5 POT TENDER
| 1221 |
JERRY CRAWLEY'S JOB
2ND SHIFT
POSTED AT 1:15 PM |
06/04/2009 |
06/08/2009 |
| LG10 BID PLATE PROCESSOR
| 1220 |
JOSUE DIAZ'S JOB
2ND SHIFT
POSTED AT 1:30 PM |
06/03/2009 |
06/05/2009 |
| LG9 CONNECTOR PLATER
| 1219 |
BRYAN MCMULLEN'S JOB
2ND SHIFT
POSTED AT 1:30 PM |
06/03/2009 |
06/05/2009 |
| LG8 LP ASSEMBLER
| 1218 |
JASON MORGAN'S JOB
3RD SHIFT
POSTED AT 1:30 PM |
06/03/2009 |
06/05/2009 |
| LG8 JC/D ASSEMBLER
| 1215 |
DAN WELCH'S JOB
2ND SHIFT
POSTED AT 3:30 PM |
06/01/2009 |
06/03/2009 |
| LG10/5 BID CASTER/POT TENDER
| 1214 |
KEVIN HINOTE'S JOB
2ND SHIFT
POSTED AT 3:30 PM |
06/01/2009 |
06/03/2009 |
| LG10 BID PLATE PROCESSOR
| 1213 |
NEW
3RD SHIFT
POSTED AT 1PM |
06/01/2009 |
06/03/2009 |
| LG6 CASTER
| 1212 |
NEW (2 JOBS)
2ND SHIFT
POSTED AT 1PM |
06/01/2009 |
06/03/2009 |
| LG9 TRUCK DRIVER
| 1211 |
DEBBIE JONES' JOB
2ND SHIFT
POSTED AT 2:45 PM |
05/28/2009 |
06/01/2009 |
| LG6 CASTER
| 1210 |
JEREMY MCBEATH
2ND SHIFT
POSTED AT 2:45 PM |
05/28/2009 |
06/01/2009 |
| LG4 HELIUM TESTER
| 1209 |
CHRISTIE ODORE'S JOB
2ND SHIFT
POSTED AT 3:30PM |
05/21/2009 |
05/25/2009 |
| LG9 TRUCK DRIVER
| 1208 |
RONDA THOMPSON'S JOB
FSS 5AM/5PM
POSTED AT 3PM |
05/19/2009 |
05/21/2009 |
| LG8 LP ASSEMBLER
| 1207 |
MATT SNIDER'S JOB
1ST SHIFT
POSTED AT 11AM |
05/18/2009 |
05/20/2009 |
| LG9 Truck Driver
| 1206 |
Larry Schidler's job
1st shift
posted at 11:00am |
05/14/2009 |
05/18/2009 |
| SWEEPER
| 1205 |
LISA ABERNATHY'S JOB
1ST SHIFT
POSTED AT 1:30PM |
05/13/2009 |
05/15/2009 |
| LG6 CASTER
| 1204 |
JOE VINCENT'S JOB
1ST SHIFT
POSTED AT 1:30PM |
05/13/2009 |
05/15/2009 |
| LG9 PASTE MACHINE TAKE OFF/PMC
| 1203 |
ASHLEY MCDANIEL'S JOB
2ND SHIFT
POSTED AT 1:30PM |
05/13/2009 |
05/15/2009 |
| LG6 CASTER
| 1202 |
ANDREW FOUST'S JOB
1ST SHIFT
POSTED AT 11:30AM |
05/08/2009 |
05/12/2009 |
| LG9 PASTE MACHINE TAKEOFF
| 1201 |
BOBBY JONES' JOB
1ST SHIFT
POSTED AT 11:30AM |
05/08/2009 |
05/12/2009 |
| LG9 PARTS PACKER
| 1200 |
JEFF BOSSAER'S JOB
2ND SHIFT
POSTED AT 11:30AM |
05/08/2009 |
05/12/2009 |
| LG9 PASTE MACHINE TAKEOFF
| 1199 |
RYAN WAKELAND'S JOB
3RD SHIFT
POSTED AT 11:30AM |
05/08/2009 |
05/12/2009 |
| LG6 CASTER
| 1198 |
ROBERTO BENAVIDEZ'S JOB
2ND SHIFT
POSTED AT 8AM |
05/08/2009 |
05/12/2009 |
| SWEEPER
| 1195 |
JAMES PETRO'S JOB
2ND SHIFT
POSTED AT 8AM |
05/06/2009 |
05/08/2009 |
| LG8 LP ASSEMBLER
| 1194 |
TOM CLEMMONS' JOB
2ND SHIFT
POSTED AT 8AM |
05/06/2009 |
05/08/2009 |
| LG9 BID PLATE PROCESSOR
| 1193 |
JASON HANSHEW'S JOB
3RD SHIFT
POSTED AT 8AM |
05/06/2009 |
05/08/2009 |
| LG9 CONNECTOR PLATER
| 1192 |
BRYAN MCMULLEN'S JOB
2ND SHIFT
POSTED AT 8AM |
05/06/2009 |
05/08/2009 |
| LG10 BID PLATE PROCESSOR
| 1191 |
SOHN BOWLING'S JOB
3RD SHIFT
POSTED AT 10AM |
05/01/2009 |
05/05/2009 |
| LG6/8/9/10 IND/MISSILE UTILITY
| 1190 |
AARON STONEBRAKER'S JOB
1ST SHIFT
POSTED AT 10AM |
05/01/2009 |
05/05/2009 |
| LG5/6/9/10 CASTING UTILITY
| 1189 |
KEVIN HINOTE'S JOB
2ND SHIFT
POSTED AT 10AM |
05/01/2009 |
05/05/2009 |
| LG6 CASTER
| 1188 |
BRAD SEARCY'S JOB
3RD SHIFT
POSTED AT 10AM |
05/01/2009 |
05/05/2009 |
| LG8 LP ASSEMBLER
| 1187 |
ANDREW GEYER'S JOB
3RD SHIFT
POSTED AT 10AM |
05/01/2009 |
05/05/2009 |
| LG8 LP ASSEMBLER
| 1186 |
JASON MORGAN'S JOB
2ND SHIFT
POSTED AT 10AM |
05/01/2009 |
05/05/2009 |
| LG8 LP ASSEMBLER
| 1185 |
RICHARD RUSH'S JOB
3RD SHIFT
POSTED AT 2PM |
04/28/2009 |
04/30/2009 |
| SWEEPER
| 1184 |
CRAIG JONES' JOB
3RD SHIFT
POSTED AT 2PM |
04/28/2009 |
04/30/2009 |
| LG8 LP ASSEMBLER
| 1183 |
JEFF CAMPBELL'S JOB
2ND SHIFT
POSTED AT 2PM |
04/28/2009 |
04/30/2009 |
| LG10/5 BID CASTER/POT TENDER
| 1181 |
BILL BROWN'S JOB
2ND SHIFT
POSTED AT 2PM |
04/28/2009 |
04/30/2009 |
| LG5/6/9/10 CASTING UTILITY
| 1180 |
DUANE PETERSON'S JOB
1ST SHIFT
POSTED AT 2PM |
04/28/2009 |
04/30/2009 |
| LG9 PASTE MACHINE TAKE OFF
| 1179 |
PAUL HOWARD'S JOB
1ST SHIFT
POSTED AT 8:45AM |
04/24/2009 |
04/28/2009 |
| LG6 DOUBLE GLUER
| 1178 |
GREG WESLEY'S JOB
2ND SHIFT
POSTED AT 8:45AM |
04/24/2009 |
04/28/2009 |
| LG6 CASTER
| 1177 |
DANNY HUBER'S JOB
1ST SHIFT
POSTED AT 2:15 |
04/21/2009 |
04/23/2009 |
| LG9 CONT. SHIPPING UTILITY
| 1176 |
NEW (2 JOBS)
M/TH 4PM-2AM
POSTED AT 11:30AM |
04/20/2009 |
04/22/2009 |
| LG8 LP ASSEMBLER
| 1175 |
NEW JOB
1ST SHIFT
POSTED AT 11:30AM |
04/20/2009 |
04/22/2009 |
| LP ASSEMBLER UTILITY
| 1174 |
JEFF MCMULLEN'S JOB
1ST SHIFT
POSTED AT 11:30AM |
04/20/2009 |
04/22/2009 |
| LG9 TRUCK DRIVER
| 1173 |
BRIAN HARDIN'S JOB
3RD SHIFT
POSTED AT 3PM |
04/16/2009 |
04/20/2009 |
| LG8 PASTE MACHINE OPERATOR
| 1172 |
TONY WILKINSON'S JOB
1ST SHIFT
POSTED AT 3PM |
04/15/2009 |
04/17/2009 |
| LG8 LP ASSEMBLER
| 1171 |
JACOB BAINBRIDGE'S JOB
3RD SHIFT
POSTED AT 12PM |
04/14/2009 |
04/16/2009 |
| LG9 PASTE MACHINE TAKE OFF/PMC
| 1170 |
VERON BABB'S JOB
2ND SHIFT
POSTED AT 8:30AM |
04/14/2009 |
04/16/2009 |
| LG9 CONNECTOR PLATER
| 1169 |
BRYAN MCMULLEN'S JOB
2ND SHIFT
POSTED AT 10AM |
04/13/2009 |
04/15/2009 |
| LG6 BATTERY REPAIR
| 1168 |
NEW JOB
FSS 5AM-5PM
POSTED AT 2:30PM |
04/08/2009 |
04/10/2009 |
| LG6 RMA/REPAIR
| 1167 |
NEW JOB
2ND SHIFT
POSTED AT 2:30PM |
04/08/2009 |
04/10/2009 |
| LG6 RMA/REPAIR
| 1166 |
NEW JOB
1ST SHIFT
POSTED AT 2:30PM |
04/08/2009 |
04/10/2009 |
| LG9 PASTE MACHINE TAKE OFF
| 1165 |
JOEY PYCKE'S JOB
3RD SHIFT
POSTED AT 9AM |
04/06/2009 |
04/08/2009 |
| LG8 LP ASSEMBLER
| 1164 |
Wilfred Chavez' job
1st shift
posted at 11:30am |
04/03/2009 |
04/07/2009 |
| LG10 BID PLATE PROCESSOR
| 1163 |
BALDEMAR BERMEA
1ST SHIFT
POSTED 2:45 PM |
03/30/2009 |
04/01/2009 |
| LG9 KIT BUILDER/TRUCK DRIVER
| 1162 |
BRENDA GRIMES' JOB
3RD SHIFT
POSTED AT 2PM |
03/30/2009 |
04/01/2009 |
| LG8 LP ASSEMBLER
| 1161 |
KEN STAPLETON'S JOB
2ND SHIFT
POSTED AT 2PM |
03/27/2009 |
03/31/2009 |
| LG5 POT TENDER
| 1160 |
ADAM GULLEY'S JOB
2ND SHIFT
POSTED AT 2PM |
03/27/2009 |
03/31/2009 |
| LG6 CASTER
| 1159 |
WILLIAM WHEELER'S JOB
3RD SHIFT
POSTED AT 2PM |
03/27/2009 |
03/31/2009 |
| LG8 LP ASSEMBLER
| 1158 |
TRAVIS WINCHESTER'S JOB
2ND SHIFT
POSTED AT 2PM |
03/27/2009 |
03/31/2009 |
| LG4 HELIUM TESTER
| 1155 |
NATASHA EVERSON'S JOB
3RD SHIFT
POSTED AT 11:15A... |
03/26/2009 |
03/30/2009 |
| LG10 BID PLATE PROCESSOR
| 1154 |
NICK THROWER'S JOB
3RD SHIFT
POSTED AT 11AM |
03/25/2009 |
03/27/2009 |
| LG6 CASTER
| 1153 |
2 NEW JOBS
2ND SHIFT
POSTED AT 3PM |
03/24/2009 |
03/26/2009 |
| LG9 TRUCK DRIVER
| 1152 |
TREVOR MARTIN'S JOB
3RD SHIFT
POSTED AT 8:30AM |
03/24/2009 |
03/26/2009 |
| LG6 DOUBLE GLUER
| 1151 |
GREG WESLEY'S JOB
2ND SHIFT
POSTED AT 8:30AM |
03/24/2009 |
03/26/2009 |
| LG8 LP ASSEMBLER
| 1150 |
LISA ABERNATHY'S JOB
3RD SHIFT
POSTED AT 8:30AM |
03/24/2009 |
03/26/2009 |
| SWEEPER
| 1149 |
JAY JOHNSON'S JOB
2ND SHIFT
POSTED AT 8:30AM |
03/23/2009 |
03/25/2009 |
| SWEEPER
| 1148 |
ROBERT WILSON'S JOB
1st SHIFT
POSTED AT 9AM |
03/19/2009 |
03/23/2009 |
| LG9 PASTE MACHINE TAKEOFF /PMC
| 1147 |
TRISHA JORDAN'S JOB
2ND SHIFT
POSTED 3:00 PM |
03/18/2009 |
03/20/2009 |
| LG8 LP ASSEMBLER
| 1146 |
JEREMY SCOLLEY'S JOB
1ST SHIFT
POSTED 3:00 PM |
03/18/2009 |
03/20/2009 |
| LG6 DOUBLE GLUER
| 1145 |
REBECCA WHITE'S JOB
3RD SHIFT
POSTED 3:00 PM |
03/18/2009 |
03/20/2009 |
| LG8 PASTE MACHINE OPERATOR/PMC
| 1144 |
NEW JOB
2ND SHIFT
POSTED 12:45 PM |
03/16/2009 |
03/18/2009 |
| LG7 PASTE MIXER OPERATOR/PMC
| 1143 |
NEW JOB
2ND SHIFT
POSTED 12:45 PM |
03/16/2009 |
03/18/2009 |
| LG8 LP ASSEMBLY
| 1142 |
DENNIS HARDIN'S JOB
3RD SHIFT
POSTED 12:45 PM |
03/16/2009 |
03/18/2009 |
| LG9 TRUCK DRIVER
| 1141 |
LARRY SCHIDLER'S JOB
2ND SHIFT
POSTED 12:45 PM |
03/16/2009 |
03/18/2009 |
| LG6 DOUBLE GLUER
| 1140 |
GREG WESLEY'S JOB
2ND SHIFT
POSTED 8:00 AM |
03/12/2009 |
03/16/2009 |
| LP ASSEMBLY UTILITY
| 1139 |
JOSH WHEELER'S JOB
3RD SHIFT
POSTED 8:00 AM |
03/12/2009 |
03/16/2009 |
| LG8 LP ASSEMBLY
| 1138 |
WAYNE MORGAN'S JOB
1ST SHIFT
POSTED 11:30 AM |
03/09/2009 |
03/11/2009 |
| LG 10/5 BID CASTER/POT TENDER
| 1137 |
WILLIAM BROWN'S JOB
2ND SHIFT
POSTED @ 11:30 AM |
03/09/2009 |
03/11/2009 |
| LG9 CONT POST PLATER
| 1136 |
PAUL MCKINNEY'S JOB
FSS 5A/5P
POSTED AT 2:15 PM |
03/06/2009 |
03/10/2009 |
| LG9 TRUCK DRIVER
| 1134 |
LARRY SCHIDLER'S JOB
2ND SHIFT
POSTED AT 2:00 PM |
03/04/2009 |
03/06/2009 |
| LG5/6/9/10 CASTING UTILITY
| 1133 |
DAVID LAMBKA'S JOB
1ST SHIFT
POSTED AT 2:00 PM |
03/04/2009 |
03/06/2009 |
| LG8 LP ASSEMBLY
| 1132 |
NEW JOB
2ND SHIFT
POSTED AT 2:00 PM |
03/04/2009 |
03/06/2009 |
| LG10 BID PLATE PROCESSOR
| 1131 |
BILLY BROOKS JOB
1ST SHIFT
POSTED AT 9AM |
03/03/2009 |
03/05/2009 |
| SWEEPER
| 1130 |
KELLY FROEDGE'S JOB
3RD SHIFT
POSTED AT 1:15PM |
03/02/2009 |
03/04/2009 |
| LG9 CONT. TRUCK DRIVER
| 1129 |
JERRY CRAWLEY'S JOB
FSS 5AM-5PM
POSTED AT 1:15P... |
03/02/2009 |
03/04/2009 |
| LG8 ASSEMBLY UTILITY
| 1128 |
Jeff McMullen's job
1st shift
posted at 1:15pm |
03/02/2009 |
03/04/2009 |
| LG 9 FORK TRUCK DRIVER
| 1127 |
3RD SHIFT
TREVOR MARTIN'S JOB
POSTED 1:15 PM |
02/26/2009 |
03/02/2009 |
| LG 4 CONT AIR TESTER/DIELECTRIC TESTER
| 1126 |
M/TH 4P/2A
DAN ROBERTS' JOB
POSTED 1:15 PM |
02/26/2009 |
03/02/2009 |
| LG 10 BID PLATE PROCESSOR
| 1125 |
3RD SHIFT
SOHN BOWLING'S JOB
POSTED 10:00 AM |
02/25/2009 |
02/27/2009 |
| LG 10 BID PLATE PROCESSOR
| 1125 |
3RD SHIFT
SOHN BOWLING'S JOB
POSTED 10:00 AM |
02/25/2009 |
02/27/2009 |
| LG 9 PASTE MACHINE TAKE OFF/PMC
| 1124 |
2ND SHIFT
BRYAN MCMULLEN'S JOB
POSTED 11:15 AM |
02/24/2009 |
02/26/2009 |
| lLG 9 FORK TRUCK DRIVER
| 1123 |
2ND SHIFT
DEBBIE JONES' JOB
POSTED 11:15 AM |
02/24/2009 |
02/26/2009 |
| LG 9 CONNECTOR PLATER
| 1121 |
3RD SHIFT
JOSH JONES' JOB
POSTED 10:00 AM |
02/23/2009 |
02/25/2009 |
| LG 8 ASSEMBLER
| 1121 |
1ST SHIFT
CHRIS KELLY'S JOB
POSTED 3:00 PM |
02/20/2009 |
02/24/2009 |
| LG 9 CONNECTOR PLATER
| 1120 |
2ND SHIFT
APRIL BAINBRIDGE'S JOB
POSTED 10:45 AM |
02/20/2009 |
02/24/2009 |
| LG 8 ASSEMBLER
| 1119 |
3RD SHIFT
RANDY HINKLE'S JOB
POSTED 10:45 AM |
02/20/2009 |
02/24/2009 |
| LG 4 HELIUM TESTER
| 1118 |
2ND SHIFT
CHRISTIE ODORE'S JOB
POSTED 10:45 AM |
02/20/2009 |
02/24/2009 |
| LG 9 FORK TRUCK DRIVER
| 1117 |
3RD SHIFT
EMMA EVERETT'S JOB
POSTED 10:00 AM |
02/19/2009 |
02/23/2009 |
| LG 9 CONT POST PLATER
| 1116 |
FSS 5A/5P
MIKE SNEDECKER'S JOB
POSTED 9:30 AM |
02/18/2009 |
02/20/2009 |
| LG 9 CONT SHIPPING UTILITY
| 1115 |
FSS 5A/5P
RANDY LOY'S JOB
POSTE 9:30 AM |
02/18/2009 |
02/20/2009 |
| LG 4 CONT AIR TESTER/DIELECTRIC TESTER
| 1114 |
FSS 5A/5P
TONYA MCGAHA'S JOB
POSTED 9:30 AM |
02/18/2009 |
02/20/2009 |
| LG 6 CASTER 3RD SHIFT
| 1113 |
3RD SHIFT
BOBBY POOLE'S JOB
POSTED 3:00 PM |
02/05/2009 |
02/09/2009 |
| LG 9 FORK TRUCK DRIVER 3RD SHIFT
| 1112 |
3RD SHIFT
MARIAH SALTZGIVER'S JOB
POSTED 3:00 PM |
02/03/2009 |
02/05/2009 |
| LG 9 CONTINUOUS SHIPPING UTILITY
| 1111 |
M/TH 5 A/3P
MAX CRIPE'S JOB
POSTED 10:15 AM |
01/27/2009 |
01/29/2009 |
| LG 9 TRUCK DRIVER
| 1109 |
3RD SHIFT
LEE BOOTH'S JOB
POSTED 1:30 PM |
01/20/2009 |
01/22/2009 |
| LG 9CONTINUOUS CEEL PICKER.TRUCK DRIVER
| 1108 |
M/TH 4P/2A
CATHY FISHER'S JOB
POSTED 1:15 PM |
01/20/2009 |
01/22/2009 |
| LG 6,8,9,10 IND/MISSILE UTILITY 1ST SHIFT
| 1107 |
1ST SHIFT
NEW JOB
POSTED 1:00 PM |
01/20/2009 |
01/22/2009 |
| LG8 LP ASSEMBLER 3RD SHIFT
| 1106 |
3RD SHIFT
DEBBI HAYMAKER'S JOB
POSTED 1:30 PM |
01/19/2009 |
01/21/2009 |
| LG9 Paste Machine Takeoff
| 1105 |
Jeff Larson's Job
3rd shift
posted at 11:30am |
01/16/2009 |
01/20/2009 |
| LG CONTINUOUS PACKER SHIPPER
| 1104 |
MON/THURSDAY 6PM/4AM
NEW JOB
POSTED 10:00 AM |
01/16/2009 |
01/20/2009 |
| LG 9 CONTINUOUS POST PLATER M/TH 4P/2A
| 1103 |
M/TH 4P/2A
TIFFANY JORDAN'S JOB
POSTED 11:00 AM |
01/16/2009 |
01/20/2009 |
| 3RD SHIFT LP ASSEMBLY UTILITY
| 1101 |
3RD SHIFT
TYLER PITHOUD'S JOB
POSTED1:30 PM |
01/15/2009 |
01/19/2009 |
| LG 8 PASTE MACHINE OPERATOR 3RD SHIFT
| 1100 |
3RD SHIFT
DEWAYNE KROUT'S JOB
POSTED 11:30 AM |
01/14/2009 |
01/16/2009 |
| SWEEPER 2ND SHIFT
| 1099 |
2ND SHIFT
JIM HOBBS' JOB
POSTED 11:00 AM |
01/14/2009 |
01/16/2009 |
| LG 6 CASTER
| 1098 |
3RD SHIFT
JEFF McMULLEN JR'S JOB
POSTED 1:30 PM |
01/13/2009 |
01/15/2009 |
| LG 6 CASTER 2ND SHIFT
| JOB BID 1095 |
2ND SHIFT
WILLIE WHEELER'S JOB
POSTED 1:30 PM |
01/09/2009 |
01/13/2009 |
| LG CASTER 3RD SHIFT
| 1096 |
3RD SHIFT
BOBBY POOLE'S JOB
11:00 AM |
01/08/2009 |
01/12/2009 |
| LG 6 CASTER
| 1095 |
3rd shift
Frank Clevenger's Job
Posted 1:00 PM |
01/07/2009 |
01/09/2009 |
| LG 9 TRUCK DRIVER 3RD SHIFT
| 1094 |
3RD SHIFT
TREVOR MARTIN'S JOB
POSTED 8:00 AM |
01/07/2009 |
01/09/2009 |
| LG 8 LP Assembler
| 1093 |
Randy Hinkle's Job
3rd shift
posted at 10:30am |
01/06/2009 |
01/08/2009 |
| LG 9 Paste Machine Take Off
| 1092 |
Joey Pycke's Job
3rd shift
Posted at 8:30 AM |
01/06/2009 |
01/08/2009 |
| LG9 TRUCK DRIVER
| 1079 |
LARRY SCHIDLER'S JOB
2ND SHIFT
POSTED AT 1PM |
11/14/2008 |
11/18/2008 |
| LG4 HELIUM TESTER
| 1078 |
CHRIS BOOTH'S JOB
2ND SHIFT
POSTED AT 10AM |
11/13/2008 |
11/17/2008 |
| LG8 LP ASSEMBLER
| 1077 |
JEREMY SCOLLEY'S JOB
1ST SHIFT
POSTED AT 10AM |
11/13/2008 |
11/17/2008 |
| LG10 BID PLATE PROCESSOR
| 1076 |
SOHN BOWLING'S JOB
3RD SHIFT
POSTED AT 8:30AM |
11/10/2008 |
11/12/2008 |
| LGP ASSEMBLY UTILITY
| 1075 |
BRIAN HARDIN'S JOB
2ND SHIFT
POSTED AT 9AM |
11/06/2008 |
11/10/2008 |
| LG8 LP ASSEMBLER
| 1074 |
CHARLES VERHEY'S JOB
3RD SHIFT
POSTED AT 9AM |
11/06/2008 |
11/10/2008 |
| CONT. LP SHIPPING UTILITY
| 1073 |
NEW (2 JOBS)
M/TH 5AM-3PM
POSTED AT 1:30PM |
11/04/2008 |
11/06/2008 |
| LG9 PASTE MACHINE TAKEOFF/PMC
| 1072 |
BRIAN HEMP'S JOB
2ND SHIFT
POSTED AT 11AM |
11/03/2008 |
11/05/2008 |
| LG10 BID PLATE PROCESSOR
| 1071 |
AMEUDI VEGA'S JOB
3RD SHIFT
POSTED AT 11AM |
11/03/2008 |
11/05/2008 |
| LG8 LP ASSEMBLER
| 1070 |
TRAVIS ALLEN'S JOB
1ST SHIFT
POSTED AT 11AM |
11/03/2008 |
11/05/2008 |
| SWEEPER
| 1069 |
LEE BOOTH'S JOB
3RD SHIFT
POSTED AT 11AM |
11/03/2008 |
11/05/2008 |
| LG9 TRUCK DRIVER
| 1068 |
ANGELA PRIBBLE'S JOB
3RD SHIFT
POSTED AT 11AM |
10/29/2008 |
10/31/2008 |
| LG9 TRUCK DRIVER
| 1067 |
A.J. DAYHUFF'S JOB
2ND SHIFT
POSTED AT 8:30AM |
10/27/2008 |
10/29/2008 |
| LG9 TRUCK DRIVER
| 1066 |
SCOTT ASHLEY'S JOB
1ST SHIFT
POSTED AT 11:30AM |
10/22/2008 |
10/24/2008 |
| LG5 POT TENDER
| 1064 |
ROB THROCKMORTON'S JOB
2ND SHIFT
POSTED AT 2PM |
10/17/2008 |
10/21/2008 |
| LG10 BID PLATE PROCESSOR
| 1063 |
LT BRIDGMAN'S JOB
3RD SHIFT
POSTED AT 10AM |
10/16/2008 |
10/20/2008 |
| LG4 CONT. AIR TESTER/DIELECTRIC/LEAK REPAIR
| 1062 |
NEW
M-TH 4PM-2AM
POSTED AT 2:30PM |
10/15/2008 |
10/17/2008 |
| LG4 CONT. AIR TESTER/DIELECTRIC/LEAK REPAIR
| 1061 |
NEW
M/TH 5AM-3PM
POSTED AT 2:30PM |
10/15/2008 |
10/17/2008 |
| LG6 CASTER
| 1060 |
NEW
2ND SHIFT
POSTED AT 8:30AM |
10/15/2008 |
10/17/2008 |
| LG8 LP ASSEMBLER
| 1059 |
RANDELL LOY'S JOB
2ND SHIFT
POSTED AT 10AM |
10/14/2008 |
10/16/2008 |
| LG10 BID PLATE PROCESSOR
| 1058 |
AARON BREDENBURGH'S JOB
2ND SHIFT
POSTED AT 11:4... |
10/09/2008 |
10/13/2008 |
| LG6 CASTER
| 1057 |
JOSUE DIAZ
2ND SHIFT
POSTED AT 11:45AM |
10/09/2008 |
10/13/2008 |
| CONTINUOUS LP SHIPPING UTILITY PERSON
| 1056 |
NEW (2 JOBS)
FSS 5AM-5PM
POSTED AT 11:45AM |
10/09/2008 |
10/13/2008 |
| LG7 PASTE MACHINE MIXER/PMC
| 1055 |
2ND SHIFT NEW POSTED AT 3:30 PM |
10/07/2008 |
10/09/2008 |
| LG8 PASTE MACHINE OPERATOR/PMC
| 1054 |
2ND SHIFT NEW JOB POSTED AT 3:30 PM |
10/07/2008 |
10/09/2008 |
| LG9 TRUCK DRIVER
| 1053 |
ZACH COOPER'S JOB
3RD SHIFT
POSTED AT 3:30PM |
10/06/2008 |
10/08/2008 |
| LG8 LP ASSEMBLER
| 1052 |
NEW JOB
1ST SHIFT
POSTED AT 2:15PM |
10/06/2008 |
10/08/2008 |
| LG6 CASTER
| 1051 |
DEANE CAMPBELL'S JOB
1ST SHIFT
POSTED AT 10:45AM |
10/06/2008 |
10/08/2008 |
| LG10 BID PLATE PROCESSOR
| 1050 |
MIGUEL RUIZ-VALENTIN'S JOB
2ND SHIFT
POSTED AT 1... |
10/06/2008 |
10/08/2008 |
| LG9/5 CASTING STOREKEEPER/POT TENDER RELIEF
| 1049 |
LARRY GRUBB'S JOB
1ST SHIFT
POSTED AT 9AM |
10/02/2008 |
10/06/2008 |
| LG9 PASTE MACHINE TAKEOFF/PMC
| 1048 |
BRIAN MCMULLEN'S JOB
2ND SHIFT
POSTED AT 9AM |
10/02/2008 |
10/06/2008 |
| LP ASSEMBLER UTILITY
| 1047 |
ALFREDO GIL'S JOB
2ND SHIFT
POSTED AT 9AM |
09/29/2008 |
10/01/2008 |
| LG8 LP ASSEMBLER
| 1046 |
MICHAEL SIMMONS' JOB
2ND SHIFT
POSTED AT 2:30PM |
09/25/2008 |
09/29/2008 |
| LG5 POT TENDER
| 1045 |
RYAN WAKELAND'S JOB
3RD SHIFT
POSTED AT 2:30APM |
09/25/2008 |
09/29/2008 |
| LG9 CONT PACKER/SHIPPER
| 1044 |
JARROD DEZARN'S JOB
6PM-4AM M/TH
POSTED AT 8:45A... |
09/22/2008 |
09/24/2008 |
| SWEEPER
| 1043 |
YVONNE COX'S JOB
2ND SHIFT
POSTED AT 8:45AM |
09/22/2008 |
09/24/2008 |
| LG9 PASTE MACHINE TAKEOFF
| 1042 |
JEFF DARK'S JOB
3RD SHIFT
POSTED AT 8:45AM |
09/22/2008 |
09/24/2008 |
| LG8 LP ASSEMBLER
| 1041 |
TRAVIS CHILDRESS' JOB
3RD SHIFT
POSTED AT 8:45AM |
09/22/2008 |
09/24/2008 |
| LG10 BID PLATE PROCESSOR
| 1040 |
JOEY PYCKE'S JOB
3RD SHIFT
POSTED AT 8:45AM |
09/22/2008 |
09/24/2008 |
| LG10 BID PLATE PROCESSOR
| 1039 |
AARON VREDENBURGH'S JOB
2ND SHIFT
POSTED AT 8:45... |
09/22/2008 |
09/24/2008 |
| LG9 PASTE MACHINE TAKE OFF/PMC
| 1028 |
DENNIS CRABTREE'S JOB
2ND SHIFT
POSTED AT 10:15A... |
09/15/2008 |
09/17/2008 |
| LG10 BID CASTER
| 1027 |
DAN SIMMONS' JOB
1ST SHIFT
POSTED AT 10:15AM |
09/15/2008 |
09/17/2008 |
| LG10 BID PLATE PROCESSOR
| 1026 |
RUSTY SMITH'S JOB
1ST SHIFT
POSTED AT 10:15AM |
09/15/2008 |
09/17/2008 |
| LG8 LP ASSEMBLER
| 1025 |
SCOTT CHILDERS' JOB
2ND SHIFT
POSTED AT 3PM |
09/11/2008 |
09/15/2008 |
| LG10 BID PLATE PROCESSOR
| 1024 |
AARON VREDENBURGH'S JOB
2ND SHIFT
POSTED AT 3PM |
09/11/2008 |
09/15/2008 |
| LG8 REWORK CHARGER/PLATE DRY CHARGER
| 1023 |
LOUIS BORST'S JOB
1ST SHIFT
POSTED AT 3PM |
09/11/2008 |
09/15/2008 |
| LG8 LP ASSEMBLER
| 1022 |
DALE PARKER'S JOB
2ND SHIFT
POSTED AT 3PM |
09/11/2008 |
09/15/2008 |
| LG8 PASTE MACHINE OPERATOR
| 1021 |
MICHAEL HAYMAN'S JOB
3RD SHIFT
POSTED AT 3PM |
09/11/2008 |
09/15/2008 |
| LG9 PASTE MACHINE TAKE OFF
| 1020 |
JEFF DARK'S JOB
3RD SHIFT
POSTED AT 3PM |
09/11/2008 |
09/15/2008 |
| LG6 CASTER
| 1019 |
NEW
3RD SHIFT
POSTED AT 3PM |
09/11/2008 |
09/15/2008 |
| LG6 CASTER
| 1018 |
NEW
2ND SHIFT
POSTED AT 3PM |
09/11/2008 |
09/15/2008 |
| LG6 CASTER
| 1017 |
NEW
1ST SHIFT
POSTED AT 3PM |
09/11/2008 |
09/15/2008 |
| LG6 REPAIR
| 1016 |
NEW
3RD SHIFT
POSTED AT 9AM |
09/09/2008 |
09/11/2008 |
| LG6 REPAIR
| 1015 |
NEW
2ND SHIFT
POSTED AT 9AM |
09/09/2008 |
09/11/2008 |
| LG6 REPAIR
| 1014 |
NEW
1ST SHIFT
POSTED AT 9AM |
09/09/2008 |
09/11/2008 |
| LG9 CONT PACKER/SHIPPER
| 1013 |
NEW
5AM-5PM FRI/SUN
POSTED AT 9AM |
09/09/2008 |
09/11/2008 |
| LG9 CONT. LP SHIPPING TRUCK DRIVER
| 1012 |
NEW
5AM-5PM FRI/SUN
POSTED AT 9AM |
09/09/2008 |
09/11/2008 |
| LG9 CONT. CONNECTOR PLATER
| 1011 |
NEW
5AM-5PM FRI/SUN
POSTED AT 9AM |
09/09/2008 |
09/11/2008 |
| LG4 CONT. AIR TESTER/DIELETRIC TESTER
| 1010 |
NEW (2 JOBS)
5AM-5PM FRI/SUN
POSTED AT 9AM |
09/09/2008 |
09/11/2008 |
| LG9 CONT. PACKER/SHIPPER
| 1009 |
NEW (2 JOBS)
6PM-4AM MON/THURS
POSTED AT 9AM |
09/09/2008 |
09/11/2008 |
| LG9 CONT. CELL PICKER
| 1008 |
NEW
4PM-2AM MON/THURS
POSTED AT 9AM |
09/09/2008 |
09/11/2008 |
| LG9 CONT. POST PLATER
| 1007 |
NEW (2 JOBS)
4PM-2AM MON/THURS
POSTED AT 9AM |
09/09/2008 |
09/11/2008 |
| LG4 CONT. AIR TESTER/DELECTRIC TESTER
| 1006 |
NEW (2 JOBS)
4PM-2AM MON/THURS
POSTED AT 9AM |
09/09/2008 |
09/11/2008 |
| LG4 CONT. AIR TESTER/DIELECTRIC TESTER
| 1005 |
NEW (2 JOBS)
5AM-3PM MON/THURS
POSTED AT 9AM |
09/09/2008 |
09/11/2008 |
| LG8 LP ASSEMBLER
| 1004 |
CHRIS COLLINS' JOB
2ND SHIFT
POSTED AT 9AM |
09/09/2008 |
09/11/2008 |
| LG10 BID PLATE PROCESSOR
| 1003 |
AARON VREDENBURGH'S JOB
2ND SHIFT
POSTED AT 9AM |
09/09/2008 |
09/11/2008 |
| LG6 CASTER
| 1002 |
JOHN FERGUSON'S JOB
3RD SHIFT
POSTED AT 9AM |
09/09/2008 |
09/11/2008 |
| LG8 LP ASSEMBLER
| 991 |
NEW (3 JOBS)
3RD SHIFT
POSTED AT 3PM |
08/26/2008 |
08/28/2008 |
| LG8 LP ASSEMBLER
| 990 |
JIM THOMAS' JOB
1ST SHIFT
POSTED AT 11:30AM |
08/26/2008 |
08/28/2008 |
| LG9 TRUCK DRIVER
| 989 |
RANDELL LOY'S JOB
3RD SHIFT
POSTED AT 11:30AM |
08/26/2008 |
08/28/2008 |
| LG8 LP ASSEMBLER
| 988 |
MIKE BISHER'S JOB
1ST SHIFT
POSTED AT 11:30AM |
08/26/2008 |
08/28/2008 |
| LG8 CONT EASTSIDE CHARGER
| 987 |
NEW
FSS 7AM-7PM
POSTED AT 11:30AM |
08/26/2008 |
08/28/2008 |
| LG CONT WATERBATH CHARGER
| 986 |
NEW
FSS 7PM-7AM
POSTED AT 11:30AM |
08/26/2008 |
08/28/2008 |
| LG8 CONT. WATERBATH CHARGER
| 985 |
NEW
FSS 7AM-7PM
POSTED AT 11:30AM |
08/26/2008 |
08/28/2008 |
| LG8 LP ASSEMBLY UTILITY PERSON
| 984 |
NEW (2 JOBS)
3RD SHIFT
POSTED AT 11:30AM |
08/26/2008 |
08/28/2008 |
| LG8 LP ASSEMBLY UTILITY PERSON
| 983 |
NEW (2 JOBS)
2ND SHIFT
POSTED AT 11:30AM |
08/26/2008 |
08/28/2008 |
| LG8 LP ASSEMBLY UTILITY PERSON
| 982 |
NEW (2 JOBS)
1ST SHIFT
POSTED AT 11:30AM |
08/26/2008 |
08/28/2008 |
| LG8 LP ASSEMBLER
| 981 |
CHASE BROWN'S JOB
2ND SHIFT
POSTED AT 11:30AM |
08/26/2008 |
08/28/2008 |
| LG9 TRUCK DRIVER
| 980 |
MAX CRIPE'S JOB
1ST SHIFT
POSTED AT 11:30AM |
08/26/2008 |
08/28/2008 |
| LG8 LP ASSEMBLER
| 979 |
JOHN ANDERSON'S JOB
2ND SHIFT
POSTED AT 9AM |
08/22/2008 |
08/26/2008 |
| LG10 BID CHARGING
| 978 |
TIFFANY BRITT'S JOB
1ST SHIFT
POSTED AT 9AM |
08/22/2008 |
08/26/2008 |
| LG8 LP ASSEMBLER
| 977 |
ANDREW MOORE'S JOB
2ND SHIFT
POSTED AT 9AM |
08/22/2008 |
08/26/2008 |
| LG6 CASTER
| 976 |
NEW (1 JOB)
2ND SHIFT
POSTED AT 1PM |
08/19/2008 |
08/21/2008 |
| LG6 CASTER
| 975 |
NEW (2JOBS)
1ST SHIFT
POSTED AT 1PM |
08/19/2008 |
08/21/2008 |
| LG6 CASTER
| 974 |
SHAD JONES' JOB
3RD SHIFT
POSTED AT 1PM |
08/19/2008 |
08/21/2008 |
| LG9 TRUCK DRIVER
| 973 |
NICOLE CRAWFORD'S JOB
1ST SHIFT
POSTED AT 1PM |
08/19/2008 |
08/21/2008 |
| LG10 BID PLATE PROCESSOR
| 972 |
ALLEN CORDERO'S JOB
3RD SHIFT
POSTED AT 1PM |
08/19/2008 |
08/21/2008 |
| DAWN SEARCY
| 971 |
DAWN SEARCY'S JOB
1ST SHIFT
POSTED AT 8:30AM |
08/15/2008 |
08/19/2008 |
| LG10 BID PLATE PROCESSOR
| 970 |
AARON VREDENBURGH'S JOB
2ND SHIFT
POSTED AT 8:30... |
08/15/2008 |
08/19/2008 |
| LG10 BID PLATE PROCESSOR
| 969 |
EDGAR GONZALES' JOB
2ND SHIFT
POSTED AT 8:30AM |
08/15/2008 |
08/19/2008 |
| LG10 BID PLATE PROCESSOR
| 968 |
RAMON MORALES' JOB
3RD SHIFT
POSTED AT 10:30AM |
08/12/2008 |
08/14/2008 |
| LG4 DIELECTRIC TESTER/LEAK REPAIR
| 967 |
RICK JONES' JOB
1ST SHIFT
POSTED AT 10:30AM |
08/12/2008 |
08/14/2008 |
| LG9 PASTE MACHINE TAKEOFF
| 966 |
JEFF DARK'S JOB
3RD SHIFT
POSTED AT 10:30AM |
08/12/2008 |
08/14/2008 |
| LG9 TRUCK DRIVER
| 965 |
MARK TAYLOR'S JOB
1ST SHIFT
POSTED AT 10:30AM |
08/12/2008 |
08/14/2008 |
| LG8 LP ASSEMBLER
| 964 |
TYLER PITHOUD'S JOB
3RD SHIFT
POSTED AT 11:30AM |
08/08/2008 |
08/12/2008 |
| LG5 POT TENDER
| 963 |
ROBERT POOLE'S JOB
3RD SHIFT
POSTED AT 11:30AM |
08/08/2008 |
08/12/2008 |
| SWEEPER
| 962 |
EMMA EVERETT'S JOB
1ST SHIFT
POSTED AT 11:30AM |
08/08/2008 |
08/12/2008 |
| LG5/6/9/10 CASTING UTILITY
| 961 |
JERRY ADKINS'S JOB
2ND SHIFT
POSTED AT 11:30AM |
08/08/2008 |
08/12/2008 |
| LG9 TRUCK DRIVER
| 960 |
PHYLLIS HILL'S JOB
1ST SHIFT
POSTED AT 11:30AM |
08/08/2008 |
08/12/2008 |
| LG6 DOUBLE GLUER
| 958 |
NEW
3RD SHIFT
POSTED AT 8:30AM |
08/07/2008 |
08/11/2008 |
| LG6 DOUBLE GLUER
| 957 |
NEW
2ND SHIFT
POSTED AT 8:30AM |
08/07/2008 |
08/11/2008 |
| LG6 DOUBLE GLUER
| 956 |
NEW
1ST SHIFT
POSTED AT 8:30AM |
08/07/2008 |
08/11/2008 |
| LG9 CONNECTOR PLATER
| 955 |
KRIS ALLEN'S JOB
1ST SHIFT
POSTED AT 2PM |
08/06/2008 |
08/08/2008 |
| SWEEPER
| 954 |
NEW
3RD SHIFT
POSTED AT 1PM |
08/05/2008 |
08/07/2008 |
| SWEEPER
| 953 |
NEW
2ND SHIFT
POSTED AT 1PM |
08/05/2008 |
08/07/2008 |
| SWEEPER
| 952 |
NEW
1ST SHIFT
POSTED AT 1PM |
08/05/2008 |
08/07/2008 |
| LG5/6/9/10 CASTING UTILITY
| 951 |
NATHAN GARRISON'S JOB
1ST SHIFT
POSTED AT 1PM |
08/05/2008 |
08/07/2008 |
| LG4 HELIUM TESTER
| 950 |
NEW
3RD SHIFT
POSTED AT 1PM |
08/05/2008 |
08/07/2008 |
| LG4 HELIUM TESTER
| 949 |
NEW
2ND SHIFT
POSTED AT 1PM |
08/05/2008 |
08/07/2008 |
| LG4 HELIUM TESTER
| 948 |
NEW
1ST SHIFT
POSTED AT 1PM |
08/05/2008 |
08/07/2008 |
| LG8 LP ASSEMBLER
| 947 |
NEW
3RD SHIFT
POSTED AT 1PM |
08/05/2008 |
08/07/2008 |
| LG9 TRUCK DRIVER
| 946 |
MARK TAYLOR'S JOB
1ST SHIFT
POSTED AT 11:30AM |
08/04/2008 |
08/06/2008 |
| LG9 PASTE MACHINE TAKEOFF/PMC
| 944 |
RYAN SHARP'S JOB
2ND SHIFT
POSTED AT 11:30AM |
08/04/2008 |
08/06/2008 |
| LG6 CASTER
| 943 |
JEREMY MCBEATH'S JOB
2ND SHIFT
POSTED AT 12:30PM |
07/30/2008 |
08/01/2008 |
| LG9 CONNECTOR PLATER
| 942 |
KRISTY ALLEN'S JOB
1ST SHIFT
POSTED AT 12:30PM |
07/30/2008 |
08/01/2008 |
| LG9 TRUCK DRIVER
| 941 |
MICHAEL SNEDEKER'S JOB
3RD SHIFT
POSTED AT 12:30... |
07/30/2008 |
08/01/2008 |
| LG10 BID PLATE PROCESSOR
| 940 |
JIM THOMAS' JOB
1ST SHIFT
POSTED AT 12:30PM |
07/30/2008 |
08/01/2008 |
| LG10 BID PLATE PROCESSOR
| 939 |
MIKA VREDENBURGH'S JOB
1ST SHIFT
POSTED AT 9AM |
07/30/2008 |
08/01/2008 |
| LG6 CASTER
| 938 |
DANNY HUBER'S JOB
1ST SHIFT
POSTED AT 9AM |
07/30/2008 |
08/01/2008 |
| LG8 LP ASSEMBLER
| 937 |
RANDY HINKLE'S JOB
3RD SHIFT
POSTED AT 9AM |
07/30/2008 |
08/01/2008 |
| LG6 CASTER
| 936 |
WILLIE WHEELER'S JOB
3RD SHIFT
POSTED AT 10AM |
07/28/2008 |
07/30/2008 |
| LG4 DIELECTRIC TESTER
| 935 |
DILLON DEEL'S JOB
1ST SHIFT
POSTED AT 10AM |
07/28/2008 |
07/30/2008 |
| LG9 POST PLATER
| 934 |
DAN ROBERTS' JOB
3RD SHIFT
POSTED AT 10AM |
07/28/2008 |
07/30/2008 |
| LG5/6/9/10 CASTING UTILITY
| 933 |
JOHN SHOAF'S JOB
1ST SHIFT
POSTED AT 12NOON |
07/25/2008 |
07/29/2008 |
| LG6 DOUBLE GLUER
| 932 |
BILLY BROOKS' JOB
3RD SHIFT
POSTED AT 12 NOON |
07/25/2008 |
07/29/2008 |
| LG8 LP ASSEMBLER
| 931 |
DAVY JONES' JOB
3RD SHIFT
POSTED AT 12 NOON |
07/25/2008 |
07/29/2008 |
| LG6 CASTER
| 930 |
MARK ODORE'S JOB
2ND SHIFT
POSTED AT 9:30AM |
07/24/2008 |
07/28/2008 |
| LG9 PACKER/SHIPPER
| 929 |
JOHN OLSON'S JOB
3RD SHIFT
POSTED AT 9:30AM |
07/22/2008 |
07/24/2008 |
| LG10 BID CHARGING
| 928 |
TIFFANY BRITT'S JOB
1ST SHIFT
POSTED AT 9:30AM |
07/22/2008 |
07/24/2008 |
| SWEEPER
| 927 |
JANETTE ROBERTS' JOB
3RD SHIFT
POSTED AT 9:30AM |
07/22/2008 |
07/24/2008 |
| LG6 CASTER
| 926 |
JIM WHITE'S JOB
1ST SHIFT
POSTED AT 9:30AM |
07/22/2008 |
07/24/2008 |
| LG10 BID PLATE PROCESSOR
| 925 |
TROY JORDAN'S JOB
1ST SHIFT
POSTED AT 9:30AM |
07/22/2008 |
07/24/2008 |
| LG8 CONT. WATERBATH CHARGER
| 924 |
ROCK ROBBINS' JOB
2ND SHIFT
POSTED AT 8:30AM |
07/21/2008 |
07/23/2008 |
| LG6 CASTER
| 923 |
DAVE HIMES' JOB
1ST SHIFT
POSTED AT 10AM |
07/17/2008 |
07/21/2008 |
| LG6 CASTER
| 922 |
ROBERTO BENEVIDEZ'S JOB
2ND SHIFT
POSTED AT 10AM |
07/17/2008 |
07/21/2008 |
| LG9 TRUCK DRIVER
| 921 |
JIM LOWRY'S JOB
2ND SHIFT
POSTED AT 10AM |
07/17/2008 |
07/21/2008 |
| LG9 POST PLATER
| 920 |
ZORA BOL'S JOB
1ST SHIFT
POSTED AT 10AM |
07/17/2008 |
07/21/2008 |
| LG8 LP ASSEMBLER
| 919 |
NEW
3RD SHIFT
POSTED AT 10AM |
07/17/2008 |
07/21/2008 |
| LG8 LP ASSEMBLER
| 918 |
NEW (4 JOBS)
2ND SHIFT
POSTED AT 10AM |
07/17/2008 |
07/21/2008 |
| LG8 LP ASSEMBLER
| 917 |
NEW
1ST SHIFT
POSTED AT 10AM |
07/17/2008 |
07/21/2008 |
| LG6 CASTER
| 916 |
BRAD MCDANIEL'S JOB
3RD SHIFT
POSTED AT 8:30AM |
07/16/2008 |
07/18/2008 |
| LG6 BATTERY REPAIR
| 915 |
ALEX DEEL'S JOB
2ND SHIFT
POSTED AT 3PM |
07/15/2008 |
07/17/2008 |
| LG8 CONT. WATERBATH CHARGER
| 914 |
WAYNE ARNOLD'S JOB
1ST SHIFT
POSTED AT 3PM |
07/15/2008 |
07/17/2008 |
| LG8 LP ASSEMBLER
| 913 |
NEW (2 JOBS)
2ND SHIFT
POSTED AT 11AM |
07/14/2008 |
07/16/2008 |
| LG8 LP ASSEMBLER
| 912 |
NEW
1ST SHIFT
POSTED AT 11AM |
07/14/2008 |
07/16/2008 |
| LG4 HELIUM TESTER
| 911 |
NEW
3RD SHIFT
POSTED AT 11AM |
07/14/2008 |
07/16/2008 |
| LG4 HELIUM TESTER
| 910 |
NEW
2ND SHIFT
POSTED AT 11AM |
07/14/2008 |
07/16/2008 |
| LG4 HELIUM TESTER
| 909 |
NEW
1ST SHIFT
POSTED AT 11AM |
07/14/2008 |
07/16/2008 |
| LG10 BID PLATE PROCESSOR
| 908 |
NICK THROWER'S JOB
3RD SHIFT
POSTED AT 11AM |
07/14/2008 |
07/16/2008 |
| LG8 LP ASSEMBLER UTILITY
| 907 |
NEW (2 JOBS)
3RD SHIFT
POSTED AT 11AM |
07/14/2008 |
07/16/2008 |
| LG8 LP ASSEMBLER UTILITY
| 906 |
NEW (2 JOBS)
2ND SHIFT
POSTED AT 11AM |
07/14/2008 |
07/16/2008 |
| LG8 LP ASSEMBLER UTILITY
| 905 |
NEW (2 JOBS)
1ST SHIFT
POSTED AT 11AM |
07/14/2008 |
07/16/2008 |
| LG8 JC/D ASSEMBLER
| 898 |
NEW
1st SHIFT
POSTED AT 8AM |
07/10/2008 |
07/14/2008 |
| LG6 CASTER
| 904 |
NEW (2 JOBS)
3RD SHIFT
POSTED AT 3PM |
07/09/2008 |
07/11/2008 |
| LG8 DUTY CYCLE OPERATOR
| 903 |
BRIAN KELLER'S JOB
2ND SHIFT
POSTED AT 10AM |
07/09/2008 |
07/11/2008 |
| LG6 CASTER
| 902 |
GORDON MCCOY'S JOB
2ND SHIFT
POSTED AT 10AM |
07/09/2008 |
07/11/2008 |
| LG 8/9 STORAGE RACK CONTROLLER
| 901 |
BOB CHILDRESS' JOB
1ST SHIFT
POSTED AT 10AM |
07/09/2008 |
07/11/2008 |
| LG4 CONT. AIR TESTER
| 900 |
STAN PATTENGALE'S JOB
3RD SHIFT
POSTED AT 10AM |
07/09/2008 |
07/11/2008 |
| LG4 CONT. AIR TESTER
| 899 |
BECKY WHITE'S JOB
1ST SHIFT
POSTED AT 10AM |
07/09/2008 |
07/11/2008 |
| LG6 CASTER
| 897 |
RICH HISLOPE'S JOB
2ND SHIFT
POSTED AT 10AM |
07/09/2008 |
07/11/2008 |
| LG10/5 BID CASTER/POT TENDER
| 896 |
NEW
SECOND SHIFT
POSTED AT 10:30AM |
07/08/2008 |
07/10/2008 |
| LG8 LP ASSEMBLER
| 895 |
NEW (2 JOBS)
2ND SHIFT
POSTED AT 10:30AM |
07/08/2008 |
07/10/2008 |
| LG8 LP ASSEMBLER
| 894 |
NEW
1ST SHIFT
POSTED AT 10:30AM |
07/08/2008 |
07/10/2008 |
| LG5/6/9/10 CASTING UTILITY
| 893 |
PHIL KELLER'S JOB
3RD SHIFT
POSTED AT 11:30AM |
07/07/2008 |
07/09/2008 |